A construction loan isn't a regular mortgage with a longer wait. It works differently from the first day: the money comes out in pieces, you pay interest as you go, and the lender is watching the job as closely as you are. If you understand how it works before you start, you'll make better decisions about your lot, your builder, and your schedule.

Quick note before we start: this is general education. Loan programs change and every lender has its own rules, so treat this as the map and let a lender who does construction loans every week give you the turn-by-turn.

One-time close vs two-time close

There are two basic ways to structure it.

One-time close (construction-to-permanent)Two-time close
ClosingsOne. The loan converts to a regular mortgage when the house is done.Two. A construction loan first, then a separate permanent mortgage at the end.
Closing costsOne setTwo sets, typically
RateOften set up front for the permanent loan (programs vary on whether you can get a lower rate at conversion)Construction loan rate during the build; permanent rate decided at the second closing
QualifyingQualify once, up frontQualify again at the end, so your income and credit need to hold
FlexibilityLess. You're locked into that lender and program.More. You can shop the permanent loan when the house is finished.

Neither is automatically better. A one-time close gives you certainty and fewer fees. A two-time close gives you flexibility, which some people want if rates are moving or if the construction loan comes from a local bank and they'd rather shop the long-term mortgage separately. Ask your lender to price both for your situation.

How your land counts

This is the biggest advantage a lot of my Hill Country clients have. If you already own your lot, especially free and clear, many lenders will count the land's value toward your down payment. That can mean bringing little or no extra cash to closing.

If you're buying the lot and the build together, the lot price becomes part of your total project cost. If you're buying the lot now and building later, you'll likely use cash or a land loan first, and land loans usually want a bigger down payment than a home loan. I walk through that sequence in Buying a Hill Country Lot.

Most construction lenders also look at two numbers, your total cost and the as-completed appraised value, and lend a percentage of the lower one. I covered that in detail in Built-In Equity: Why Appraised Value Matters, so I won't repeat it here. One quick size note: in 2026 the baseline conforming loan limit for a one-unit home is $832,750 in most of the country. Above that, you're usually in jumbo territory, which can change the down payment and the rules.

How draws actually work

The lender doesn't hand your builder a check for the whole house. Money is released in draws as work gets done. A typical cycle looks like this:

  1. The builder finishes a stage (or a percentage of the work) and submits a draw request.
  2. The lender sends an inspector to confirm the work is actually in place.
  3. Many lenders also run a title update to make sure no liens have been filed, and collect lien releases from the builder.
  4. The lender funds the draw, often minus a holdback.

That holdback matters in Texas. The disclosure statement Texas law requires on residential construction contracts tells owners to withhold 10% of payments to the builder, directly or through the lender, until 30 days after the work is finished. It's a protection for you against unpaid-subcontractor liens. Ask your lender how they handle it.

Why delays cost real money

During construction, you typically pay interest only on what's been drawn so far, not the full loan. That sounds friendly early on, and it is. But the balance grows as the house goes up, so the expensive months are at the end. Here's a simple example with round, made-up numbers:

Example: $600,000 construction loan at 8% (illustration only)Monthly interest
25% drawn ($150,000)about $1,000
50% drawn ($300,000)about $2,000
Fully drawn ($600,000)about $4,000

So a two-month delay near the finish line (a late selection, a reordered window, a change order) can cost something like $8,000 in interest alone in this example, before you count rent or a second mortgage payment you're carrying while you wait. That's why I push clients to make selections early. More on that in The Real Custom Build Timeline.

What the lender will want from you (and your builder)

  • A signed construction contract with plans, specs, and a cost breakdown
  • Builder approval (many lenders vet the builder's experience, insurance, and finances)
  • Builder's risk insurance during construction
  • A survey and title work on the lot
  • Sometimes a contingency or interest reserve built into the loan

That same Texas disclosure statement also tells you you're entitled to get the loan closing documents at least one business day before closing. Ask for them, and read them. That's your chance to ask questions before you sign.

Here's the honest part

The loan usually isn't what breaks a build. Surprises are. The cost overrun nobody planned for, the site work that wasn't in the bid, the appraisal that came in under cost. A lender can only finance a number that's real, so the better your budget is up front, the smoother the loan goes. And once you apply, keep your finances quiet: no new car loans, no new credit cards, no large unexplained deposits. Lenders often re-check before closing.

Questions to ask a construction lender

  • "Do you offer one-time close, two-time close, or both? Can you price both for me?"
  • "How does my land equity count toward the down payment?"
  • "How many draws, how fast do they fund, and who inspects?"
  • "Is there a retainage or holdback, and when is it released?"
  • "What's the maximum construction period, and what happens if we run over?"
  • "What do you require from my builder to approve them?"

If you want to see how all of this fits with the lot, the builder, and the budget, come to my free custom home building class. We cover financing step by step, and I can point you to lenders who do construction loans regularly.

Kyle Ritter | Anders Pierce Realty | 830-998-4412 | [email protected]

This article is for educational purposes only and isn't financial or lending advice. Loan programs, limits, rates, and draw procedures vary by lender. Talk with a licensed construction lender about your specific situation.

Back to Blog