In the Hill Country, a custom home has four buckets of cost, plus the money it takes to carry the project while it's being built. Miss one and you either come up short in the middle of the build or start cutting things you actually cared about. Let's lay out every bucket so that doesn't happen to you.
Bucket 1: Land
The purchase price is the start, not the total. The land bucket also includes:
- Your closing costs on the lot, plus a land loan's fees if you're financing it
- A survey (and possibly a topographic survey, which your builder and engineer will want anyway)
- Due diligence spending during the option period: the option fee, a soil/site evaluation for septic, maybe a well or utility consult
- HOA transfer or resale-certificate fees, if there's an HOA
Bucket 2: Build
This is the builder's contract price. The trap here isn't the total, it's what's inside it. Ask for two lists before you compare bids:
- Allowances: dollar amounts for things you haven't picked yet (lighting, flooring, plumbing fixtures, appliances). If an allowance is light, you pay the difference later.
- Exclusions: what's not in the price at all. On rural lots, site work is often partly or fully excluded. That's not a builder doing anything wrong. It's just a bucket you have to fill yourself.
Two bids for the same plan can look tens of thousands of dollars apart and actually be the same price once you line up allowances and exclusions. Or the cheap one can be the expensive one.
Bucket 3: Site Work
This is the bucket that swings the most out here, because no two lots are the same. Depending on your lot, it can include:
- Clearing cedar and brush, and shaping a build pad
- Driveway (length, grade, base material, and a culvert where it meets the road)
- Rock excavation for the foundation, trenches, and septic
- Septic system design and install (in the Hill Country, often an aerobic spray system)
- Water: a tap and service line, or a well with pump, pressure tank, storage, and treatment
- Electric: line extension, trenching, and transformer from your provider
- Retaining walls and drainage work on sloped lots
I go deep on this in Slope, Rock, and Site Work: Where Hill Country Build Budgets Blow Up. The short version: get it quoted on your specific lot before you close, not after.
Bucket 4: Soft Costs
These don't show up in the house, but you pay them all the same:
- House plans and design fees
- Engineering: foundation design, sometimes drainage or retaining wall design
- Septic (OSSF) permit and design fees
- Water tap, membership, and impact fees (some providers charge impact fees on top of the tap)
- HOA or architectural review fees and construction deposits
- Construction loan costs: origination, appraisal, title, inspections
- Builder's risk insurance (confirm whether you or the builder carries it)
The Part Everyone Forgets: Carrying Costs While You Build
A custom build takes months, and you're paying to live somewhere the whole time. Plan for:
- Construction loan interest. On most construction loans you pay interest only on what's been drawn so far, so the payment grows as the house goes up.
- Your current housing. Rent or your existing mortgage keeps going until move-in. If the build runs long, so does this.
- Property taxes on the land. And here's a Texas wrinkle: appraisal districts value property as of January 1. If your house is partly built on January 1, that partial value can show up on that year's tax bill.
- Ag valuation rollback. If your land has an agricultural or wildlife valuation and you take it out of that use to build, a rollback tax can apply. Under current law, that's the tax difference for the prior three years (HB 1743 in 2019 set the three-year look-back, and HB 3833 in 2021 dropped the interest charge, so interest only applies if the rollback bill goes delinquent). Ask the appraisal district before you buy, and decide in the contract who pays it.
- Insurance and utilities on the lot. Temporary power, lot insurance, maybe storage and a second move.
Here's what interest carry can look like. These are made-up round numbers just to show the math, not a quote or a rate forecast:
| Example | Amount |
|---|---|
| Construction loan, fully drawn by the end | $700,000 |
| Average balance over the build (roughly half) | $350,000 |
| Example rate / build length | 8% / 10 months |
| Interest paid during the build | about $23,300 |
Add two extra months of delays and that number grows, while your rent keeps running too. That's why a realistic timeline is part of the budget, not separate from it.
Then Add Contingency
In my experience, a 10 to 15 percent contingency on top of everything is a smart starting point for a Hill Country build, and closer to the high end if the lot has slope or visible rock. Contingency isn't upgrade money. It's what lets you say yes to the rock nobody could see without blowing up the rest of the plan.
How to Use the Buckets
Work it backward instead of forward:
- Start with the all-in number you're comfortable with (and talk to a construction lender about what that means monthly).
- Subtract contingency and carrying costs.
- Subtract soft costs.
- Set a realistic build budget for the size and finish level you want.
- What's left is what you can spend on land plus site work combined.
That last line is the one that changes how you shop. A cheaper lot with a long driveway, deep well, and rock everywhere can cost more than a pricier lot with water at the road and a flat pad. When you shop lots, you're really shopping land plus site work. More on that in Buying a Lot in the Hill Country: The View Is Not the Value.
The Bottom Line
Four buckets, carrying costs, and contingency. Fill in every line, even with rough ranges, before you fall in love with a lot or a plan. A rough number for every line beats a precise number for two of them.
If you want help building your four-bucket budget around a lot you're looking at, text me at 830-998-4412 with the listing link and your rough plan, and I'll help you fill in the buckets with real numbers.
Kyle Ritter | Anders Pierce Realty | 830-998-4412 | [email protected]
This article is for educational purposes only and isn't financial, tax, or lending advice. Loan terms, tax rules, and fees vary, so confirm details with a licensed lender, your appraisal district, and a tax professional.