Reviewing building plans before permitting

Permits, ETJ, and HOA Review: Who Actually Has to Approve Your Build

October 28, 2026•6 min read

By Kyle Ritter | Anders Pierce Realty

"Do I need a building permit?" is one of the most common questions I get from people buying land around New Braunfels. The honest answer is: it depends on exactly where the lot sits, and "no building permit" doesn't mean "no approvals." A lot outside city limits can still need a septic permit, a floodplain permit, a driveway permit, and a sign-off from an HOA's architectural review board before anybody pours concrete.

Here's how to figure out who actually has to approve your build.

Step 1: Find out which of three places your lot is in

  1. Inside city limits (New Braunfels, Seguin, San Marcos, and so on)

  2. In a city's ETJ (extraterritorial jurisdiction, the band of unincorporated land around a city)

  3. Unincorporated county, outside any city and its ETJ

Two quick ways to check. First, pull the property up on the appraisal district website (Comal CAD or Guadalupe CAD) and look at the taxing units. If a city is listed, you're inside its limits. The ETJ won't show up there because it isn't a taxing unit, so for that, check the city's online maps or call its planning department. And always know which county you're in. Plenty of lots near New Braunfels and Seguin sit close to the Comal, Guadalupe, or Hays county lines.

Inside city limits

This is the most familiar version. In New Braunfels, for example, you need a building permit before building a home. The city's development guide lists what goes in a residential submittal: site plan, floor plan, framing details, engineered foundation and wall bracing plans, electrical, plumbing, and mechanical plans, erosion control, and energy calculations. The city states a review goal of about 10 working days for residential permits, depending on how complete the submittal is. Then come the city inspections during construction and a certificate of occupancy at the end. Zoning also applies, which can affect setbacks, accessory buildings, and use.

In the ETJ

Here's where people get confused. A city's authority in its ETJ is mostly limited to platting and subdivision rules. There's no city zoning there. New Braunfels' own development guide says building construction in its ETJ does not require a building permit, while subdivision rules still apply.

One local wrinkle: in 2022, New Braunfels agreed to let Guadalupe County handle subdivision regulation in the part of the city's ETJ that lies in Guadalupe County. The city kept that role in its Comal County ETJ. So the same city's ETJ can work differently depending on which county line you're on.

Can you get out of the ETJ? (SB 2038)

Since September 2023, Senate Bill 2038 has allowed landowners to petition to be released from a city's ETJ. A city lawsuit challenging the law was dismissed in April 2025, and the 2025 Legislature adjusted the petition and election process with HB 2512. For petitions filed on or after September 1, 2025, lots under 12 acres (unless they're part of a larger petition) and single lots inside platted subdivisions of 25 or more lots generally can't be released. The petition process is still in place for larger tracts, but this is an area where the details keep moving. Check the current status with the city and a real estate attorney before you count on it.

And remember what leaving the ETJ doesn't do. It doesn't remove deed restrictions or HOA rules, and it doesn't change county septic, floodplain, or driveway requirements.

Unincorporated county

Texas counties generally can't require a residential building permit outside cities. But you'll still deal with the county, mostly through these:

Approval

Comal County

Guadalupe County

Septic (OSSF) permit

County Engineer's Office; application includes a design from a licensed professional

Environmental Health

Floodplain development permit

County Engineer's Office, if the site is in a regulated floodplain

Environmental Health / Floodplain Manager

Driveway onto a county road

Private Improvement in the Public Right-of-Way (PIPROW) permit

Driveway permit through Road and Bridge

Other

Outdoor lighting permit inside the Camp Bullis dark skies zone

Subdivision plats through Environmental Health

Two more Hill Country items. If the lot sits over the Edwards Aquifer recharge zone, state septic rules add requirements there, so ask your septic designer early. And if you're drilling a well, check with the groundwater conservation district for that area about registration or permits. I covered both in the septic post and the water post.

Also worth asking: Texas law lets a county opt into a program that requires builders of new homes in unincorporated areas to build to the International Residential Code and get foundation, framing, and final inspections from a qualified inspector. Ask the county whether it has adopted that. Either way, I'd want those three inspections on my house.

The HOA or ARB: the approval people forget

A lot of the nicest Hill Country subdivisions are deed restricted with an architectural review board (ARB, sometimes called an ACC). On those lots, the ARB can matter more to your design than any government office. It's common for restrictions to control:

  • Minimum square footage

  • Exterior materials (stone or masonry percentages, siding types)

  • Roof material and pitch

  • Setbacks, fences, outbuildings, and driveway materials

  • Tree removal and site clearing

The review timeline, fees, and any construction deposit are set by that subdivision's own documents, not state law. So get the full packet before you design: the deed restrictions, the design guidelines, the submission checklist, and the fee schedule. Then ask to see a couple of recently approved plans. That tells you more about what the ARB actually approves than anything else.

If your plans get denied in a larger association (more than 40 lots, after the developer has handed over control), Texas law gives you the right to a written explanation and a hearing before the board. Better to never need it.

Here's the honest part

Approvals stack, and they don't always run at the same time. On many lots the order is: ARB approval of the plans, then septic design and permit, then any floodplain and driveway permits, then (if you're in a city) the building permit. Each one can send you back to change something. That's why I want to know which of these apply before my clients close on a lot, not after.

Your approvals checklist

  • City limits, ETJ, or unincorporated? Which county?

  • Building permit required? Who inspects?

  • Septic permit and designer lined up (or sewer confirmed)

  • Floodplain status checked

  • Driveway permit needed onto a county or state road?

  • Well registration or permit, if drilling

  • HOA/ARB packet in hand, timeline and fees known

Not sure which of these apply to a lot you're looking at? Text me the address at 830-998-4412 and I'll help you sort out who has to sign off before you get too far in.

Kyle Ritter | Anders Pierce Realty | 830-998-4412 | [email protected]

This article is for educational purposes only and isn't legal advice. Permit requirements, ETJ boundaries, and state law change. Confirm current requirements with the city, the county, and the HOA, and talk to a real estate attorney about ETJ questions.