Every buyer asks me some version of the same question: "What's going in over there?" It's a smart question. The road that gets widened, the park that gets built, or the hospital that breaks ground down the street will shape your home's value and your daily drive for the next decade.
The problem is that "planned" and "happening" get mixed up all the time. So for each project below I've labeled the status based on the most recent city, TxDOT, and news sources I could find as of fall 2026. Under construction means crews are working. Funded / in design means money is set aside but no dirt is moving yet. Study / proposed means it could change a lot or never happen.
The Big Highway Story: SH 46
SH 46 from I-35 to I-10 (Study / proposed). TxDOT is studying a rebuild of about 11 miles of SH 46 from I-35 east to I-10 near Seguin. The preliminary design shows elevated main lanes over the existing road in Comal County, two direct flyover ramps between SH 46 and I-35, and overpasses at Elliott Knox Boulevard, FM 1101, and Alves Lane. In Guadalupe County it would become a four-lane controlled-access highway with one-way frontage roads. Reporting in January 2026 put the estimate around $1.4 billion and noted that right-of-way and construction are not funded, with a formal public hearing anticipated in 2027.
What to do: if you're looking at property along SH 46 east of I-35, look at TxDOT's draft schematic before you buy. TxDOT has already held meetings with potentially affected property owners.
SH 46 in Bulverde (Complete). TxDOT's $59 million widening from two to six lanes between Farhills Drive and Bentwood was completed in late August 2026.
I-35 Through Town
Most current I-35 work in New Braunfels is at the interchanges, not new through lanes:
I-35 at FM 725: turn lanes and intersection work, completed in 2026.
I-35 at Solms Road (Funded / in design): rebuild of the interchange with a shared-use path, in pre-design as of early 2026.
I-35 at Loop 337 and Rueckle Road (Funded / in design): about $33.7 million in regional funding for added lanes and turnarounds, timeline undetermined.
City Road Projects You'll Feel
Project | What | Status / timing |
|---|---|---|
Goodwin Ln / Conrads Ln | Rebuild, bridge, shared path, drainage at Alligator Creek | Under construction; through about March 2027 |
Conrads Ln (Goodwin to FM 1102) | Turn lanes, signals, drainage, rail crossings | Under construction; early 2027 |
FM 2252 | Two to four lanes with a railroad overpass | Under construction; 2027 |
Kohlenberg Rd (FM 1101 to I-35) | Four lanes, turn lane, new signal | In design; construction early 2027 to mid-2029 |
Common St (Loop 337 to FM 306) | Added lanes, sidewalks, drainage | In design; 2028 to 2030 |
Barbarosa Rd / Saur Ln | Two to four lanes plus turn lane | Funded; construction mid-2028 to late 2030 |
Solms Rd | Turn lanes, sidewalks, drainage | Final design; completion expected 2029 |
Most of these come from the city's 2023 bond program. Timelines slip, so check the city's project pages for updates.
The Master-Planned Engines: Veramendi and Mayfair
Veramendi (northwest, along Loop 337) was about halfway through its single-family buildout in 2024, with roughly 6,000 total units planned over time. The developer said more than 500 new lots would come online by the end of 2026, including larger 100-foot and custom lots, plus Word Park (65+ acres) and a second amenity center. The bigger news is medical. CHRISTUS Health announced a $28 million, 35,000-square-foot micro-hospital called CHRISTUS New Braunfels Veramendi Hospital, with construction expected to begin August 31, 2026, and completion expected by late April 2028.
Mayfair (north, along I-35 between Kohlenberg Road and Woods Path Drive) is approved for about 6,000 residential units over a 15-year buildout. SouthStar's stated goals include about 2 million square feet of commercial space and over 1 million square feet of industrial space. The Midtown Mayfair pool house and Celebration Hall were slated to open in summer 2026.
I compare these communities side by side in my master-planned communities post.
Public Facilities
Southeast Branch Library (Under construction / starting): City Council approved a $16 million construction contract in February 2026 for a 23,520-square-foot library south of the Guadalupe River, with construction expected to start in summer 2026.
Proposed 2027 bond (Proposed): In July 2026 the city discussed a possible May 2027 bond election that could include Phase 1 of a 145-acre Northwest Park (projected at $25 million), drainage work at Blieders Creek and Cross Street, a public safety training facility, and fire and police vehicle replacement. Voters haven't decided anything yet.
How to Read the Growth Map as a Buyer
Put it all together and you can see the corridors: I-35 north (Mayfair, Kohlenberg, Conrads, FM 1102), the Loop 337 northwest side (Veramendi and the new hospital), SH 46 east toward Seguin (the big highway study), and SH 46 west toward Bulverde.
Here's the honest part: growth is great for values and terrible for whoever lives next to the construction. A widened road can make your commute easier and your backyard louder. A new commercial pad can bring a coffee shop or a loading dock. Neither is good or bad on its own. You just want to know before you sign.
Check the land next door. Look up zoning on the city's map, and ask the developer for the master plan if you're in a new community.
Look up road projects by name on the city's bond pages and TxDOT's project pages.
Know your jurisdiction. Inside city limits you get a vote on city bonds. Outside, you may not. My city limits vs. ETJ post explains the difference.
Read the tax bill. New infrastructure in new communities is often paid through district taxes.
Want me to pull what's planned around a specific address? Text me at 830-998-4412 and I'll send you what I find.
Kyle Ritter | Anders Pierce Realty | 830-998-4412 | [email protected]
This article is for educational purposes only. Project scopes, costs, and schedules come from public sources as of fall 2026 and change often. Confirm current status with the City of New Braunfels, TxDOT, or the developer.